Mandurah Subdivision
Sub Contractor · 2022
We were engaged by Civcon for the Mandurah Subdivision, we installed sewer lines alongside water pressure mains and gas, utilizing shoring boxes for safe excavation.
- 01 Utility Installation
- 02 Safety Measures
- 03 Collaboration
- 04 Site Coordination
Utility Installation
Installed sewer lines in conjunction with water pressure mains and gas lines.
Safety Measures
Implemented shoring boxes to ensure safe excavation practices and minimise risk management.
Collaboration
Worked closely with other contractors to coordinate utility installations effectively.
Site Coordination
Ensured effective coordination with other utilities and contractors in a busy traffic area.
Challenges
Traffic Management
Navigating heavy traffic along the main road required careful planning and coordination.
Soil Conditions
Encountered challenging soil conditions that impacted excavation and installation processes.
Limited Access
Restricted access to certain areas complicated equipment mobilisation and material delivery.
Utility Conflicts
Faced unexpected conflicts with existing underground utilities, necessitating design adjustments.
More projects
Continue through the portfolio — previous and next programmes.

Caversham Roundabout
Engaged by Tracc Civil, we assisted with the West Swan Road and Arthur Street roundabout upgrade project for the Swan Shire.
View project
Football Centre
Engaged by Tracc Civil, we completed roadworks and detailed earthworks for the Sam Kerr Football Centre at Welshpool Road and Gibbs Road project.
View project