Andrea Drive Stage 2

Request similar scope

Build smarter. Grow faster.

andrea-drive-stage-2-1.jpg
2025
Year
Henley Brook, Western Australia
Region

We were engaged to complete the Andrea Stage 2 sewer installation, utilizing shoring boxes and steel plates for trench support. This approach provided enhanced safety and stability during excavation and pipe installation.

  • 01Project planning
  • 02Safety management
  • 03Site preperation
  • 04Compliance

Project planning

Planned with a focus on utility mapping, safe excavation using shoring and steel plates, efficient sewer installation and timely restoration while meeting all safety and compliance requirements.

Safety management

Maintained through daily pre-starts, exclusion zones, proper PPE, and strict adherence to Safe Work Method Statements (SWMS).

Site preperation

Included service locating (BYDA), traffic control setup, and equipment mobilisation prior to commencing works.

Compliance

Ensured by following all relevant codes, local council requirements and utility provider standards.

Challenges

Under Ground Services

Conduct detailed utility surveys and potholing to accurately locate services before digging.

Limited Work Space

Use compact machinery and schedule just-in-time deliveries to reduce onsite congestion.

Unstable Ground

Use shoring boxes and steel plates to support trench walls and prevent collapse.

Adverse Weather Conditions

Develop a weather contingency plan with flexible scheduling and site protection measures.