Jurien Bay - Beachridge Estate
Sub Contractor · 2025
Clifton Avenue & Prevelly Way – Deep Sewer Installation. We were engaged to assist with the installation of deep sewer infrastructure within the Beachridge Estate development at Jurien Bay. The works involved excavation and installation in coastal sandy conditions with a high groundwater table.
- 01 Project planning
- 02 Problem solving
- 03 Documentation
- 04 Sustainability
Project planning
The project required detailed planning due to the proximity to the coastline and fluctuating groundwater levels. Dewatering systems were strategically positioned to control water inflow.
Problem solving
Managing groundwater was a key challenge throughout the project. Dewatering pumps were installed and repositioned as excavation progressed to maintain dry working conditions.
Documentation
Required SWMS, dig permits and safety documentation were completed and communicated to the work crew.
Sustainability
Dewatering discharge was managed responsibly to prevent erosion or environmental impact to surrounding areas.
Challenges
Groundwater & Tidal Influence
Dewatering equipment was positioned strategically to manage inflows and maintain safe trench conditions.
Dewatering Equipment Placement
Pumps, suction lines and discharge systems had to be positioned effectively to ensure continuous operation.
Deep Excavation Stability
Deep sewer installation required careful excavation techniques in sandy soils to prevent trench collapse.
Adverse Weather Conditions
Close coordination between operators, supervisors and ground crews.
More projects
Continue through the portfolio — previous and next programmes.

Electrical Infrastructure Install
We were engaged by Rewards Investments to deliver electrical infrastructure works to support a planned power upgrade, requiring coordination with a scheduled Western Power isolation. The scope included the installation of 150 metres of underground power conduit and the construction of two electrical pits to facilitate future connections.
View project
Gin Gin - Stormwater
We were engaged to assist with the construction of stormwater infrastructure and driveway crossovers within the Gin Gin civil works project. The scope involved forming and finishing stormwater manhole benching to ensure correct water flow, along with constructing concrete driveway crossovers connecting properties to the road network.
View project