Football Centre
Sub Contractor · 2022
Engaged by Tracc Civil, we completed roadworks and detailed earthworks for the Sam Kerr Football Centre at Welshpool Road and Gibbs Road project.
- 01 Roadworks construction
- 02 Detailed earthworks
- 03 Site preparation
- 04 Regulatory compliance
Roadworks construction
Completed extensive roadworks to facilitate access and enhance site infrastructure.
Detailed earthworks
Executed precise earthmoving operations, including excavation, grading, and compaction.
Site preparation
Prepared the site to meet specifications for future construction and landscaping.
Regulatory compliance
Coordinated with local authorities to ensure adherence to all relevant regulations and standards.
Challenges
Community engagement
Addressed community concerns and feedback regarding construction noise and disruption.
Limited workspace
Encountered restricted workspace due to adjacent developments and infrastructure.
Traffic disruptions
Managed significant traffic disruptions due to the project’s location on major thoroughfares.
Variable soil conditions
Faced unpredictable soil conditions that complicated excavation and required additional analysis.
More projects
Continue through the portfolio — previous and next programmes.

Mandurah Subdivision
We were engaged by Civcon for the Mandurah Subdivision, we installed sewer lines alongside water pressure mains and gas, utilizing shoring boxes for safe excavation.
View project
Jandakot stormwater
Engaged by Tracc Civil to install stormwater drainage systems for the Jandakot Industrial Lots project, ensuring effective water management and compliance with local regulations for sustainable development.
View project