HV / LV Installation
Sub Contractor · 2025
We were engaged by Tracc Civil to assist with the installation of high voltage and low voltage cables. The scope involved careful trenching, cable laying, and coordination around existing underground services to ensure safety and compliance with electrical standards.
- 01 Project planning
- 02 Problem solving
- 03 Safety measures
- 04 Inspection & testing
Project planning
Focused on detailed site assessment, sequencing of HV and LV cable installations and ensuring all works adhered to safety regulations and service authority requirements.
Problem solving
Adapting installation methods to navigate existing services, addressing access constraints and ensuring compliance with electrical safety standards throughout the project.
Safety measures
With strict safety measures including exclusion zones, PPE and live service identification protocols in place.
Inspection & testing
Inspection and testing were carried out throughout the project to verify correct cable placement, ensure compliance with electrical standards and confirm system integrity before commissioning.
Challenges
Plant Interaction
Causing site congestion and safety risks. Conflicting schedules leading to delays.
Materials Delay
We implemented proactive procurement planning, maintained regular communication with suppliers and kept a buffer stock of critical items on site to avoid work stoppages.
Underground Services
Using vacuum excavation and trained personnel to safely expose and handle existing cables.
Inclement Weather
To manage inclement weather, we implemented flexible scheduling, used protective coverings and drainage systems onsite and monitored forecasts closely to adjust work plans and ensuresafety.
More projects
Continue through the portfolio — previous and next programmes.

Henley Brook - Water Main
We were engaged by Tracc Civil to install a water main in tightly congested areas with numerous existing utilities and road build-ups. The project required careful coordination and precise excavation to safely navigate around obstacles while minimizing disruption.
View project
Beachridge 7A - Sewer
We were engaged by Direct Contracting to install 330 meters of 150 sewer main in wet water conditions, including complete pressure testing and ovality ball testing. The project was successfully completed within a tight 13-day schedule.
View project