We were engaged by Tracc Civil to install a water main in tightly congested areas with numerous existing utilities and road build-ups. The project required careful coordination and precise excavation to safely navigate around obstacles while minimizing disruption.
- 01 Project planning
- 02 Problem solving
- 03 Documentation
- 04 Sustainable practices
Project planning
With detailed utility mapping, careful excavation scheduling and traffic management to navigate tight, congested areas safely.
Problem solving
involved proactive utility coordination, adaptive excavation techniques and real-time communication to quickly address unexpected site challenges and maintain project flow.
Documentation
BYDA services located and marked prior to starting and as-built documentation prepared in accordance with design drawings. Dig permits,SWIMS, spotter in place.
Sustainable practices
Minimizing site disturbance and optimizing resource efficiency throughout installation.
Challenges
Underground Services
Maintain flexible design plans and rapid decision-making protocols to adapt to changes onsite.
Property Damage
Use non-invasive excavation methods like vacuum excavation near sensitive utilities to prevent damage.
Traffic Management Plans
Encountered restricted access to certain sections of the road, hindering equipment movement and working under traffic management.
Other Work Forces
Establish a centralized communication system and regular coordination meetings to ensure all parties are informed and aligned.
More projects
Continue through the portfolio — previous and next programmes.

Andrea Drive - Sewer
Tracc Civil engaged us to carry out the complete sewer installation on Andrea Drive, encompassing trench excavation, precise pipe laying, comprehensive testing. The project was executed efficiently, meeting all quality standards and delivered on schedule.
View project
HV / LV Installation
We were engaged by Tracc Civil to assist with the installation of high voltage and low voltage cables. The scope involved careful trenching, cable laying, and coordination around existing underground services to ensure safety and compliance with electrical standards.
View project