Henley Brook Drainage
Sub Contractor · 2024
The Henley Brook project involves the installation of deep sewer drainage systems, utilising shoring boxes to ensure safety and stability during excavation.
- 01 Installation
- 02 Deep excavation
- 03 Safety management
- 04 Quality control
Installation
Implementing shoring systems to support excavations for deep sewer installation.
Deep excavation
Excavating trenches to the required depth for sewer pipe installation.
Safety management
Identifying and managing overhead power lines to ensure safe operations.
Quality control
Conducting inspections and air tests to ensure compliance with specifications.
Challenges
High Water Table
Encountered a high water table that complicated excavation and required additional dewatering measures.
Existing Infrastructure
Navigated existing underground utilities that posed risks to installation and required careful planning.
Depth of Excavation
Managing the complexities of deep excavations while ensuring safety and stability.
Overhead power lines
Navigating the presence of overhead power lines, requiring careful planning and coordination.
More projects
Continue through the portfolio — previous and next programmes.

Champion Lakes Stormwater
The project involved stormwater installation in Champion Lakes, addressing clay soil conditions and fluctuating water tables to ensure effective drainage solutions.
View project
Hepburn Ave Drainage
Engaged by Hillary’s Shire for the Hepburn Avenue road upgrade and stormwater improvement project to enhance infrastructure and ensure better drainage and road safety.
View project