Project PRJ-HENL

Henley Brook Drainage

Request similar scope

Build smarter. Grow faster.

henley-brook-drainage-1.jpg
2024
Year
Henley Brook, Western Australia
Region

The Henley Brook project involves the installation of deep sewer drainage systems, utilising shoring boxes to ensure safety and stability during excavation.

  • 01Installation
  • 02Deep excavation
  • 03Safety management
  • 04Quality control

Installation

Implementing shoring systems to support excavations for deep sewer installation.

Deep excavation

Excavating trenches to the required depth for sewer pipe installation.

Safety management

Identifying and managing overhead power lines to ensure safe operations.

Quality control

Conducting inspections and air tests to ensure compliance with specifications.

Challenges

High Water Table

Encountered a high water table that complicated excavation and required additional dewatering measures.

Existing Infrastructure

Navigated existing underground utilities that posed risks to installation and required careful planning.

Depth of Excavation

Managing the complexities of deep excavations while ensuring safety and stability.

Overhead power lines

Navigating the presence of overhead power lines, requiring careful planning and coordination.