Hazelmere Industrial Sump
Awarded · 2024
The Hazelmere Industrial Sump project aims to enhance stormwater management, improve drainage efficiency, and mitigate flood risks in the industrial area through effective design and implementation.
- 01 Project overview
- 02 Objectives
- 03 Subsoil drainage systems
- 04 Compaction
Project overview
Development of a sump system for improved drainage and stormwater management
Objectives
Enhance site drainage efficiency and reduce flood risk in the industrial area.
Subsoil drainage systems
Installing drainage solutions, such as perforated pipes or trenches, to manage excess water.
Compaction
Properly compacting the subsoil to prevent settling and ensure structural integrity.
Challenges
Weather delays
Adverse weather conditions / strong winds causing interruptions to the installation schedule.
Community concerns
Addressing local resident complaints regarding noise and disruption during construction activities.
More projects
Continue through the portfolio — previous and next programmes.

Hepburn Ave Drainage
Engaged by Hillary’s Shire for the Hepburn Avenue road upgrade and stormwater improvement project to enhance infrastructure and ensure better drainage and road safety.
View project
Yanchep Golf Estate
The project involves footpath preparation, lot trimming, and limestone carpark installation to enhance accessibility and functionality within the RJV Golf Estate.
View project