Commercial Depot
Build smarter. Grow faster.

Engaged to help specialise in completing the earthworks using recycled asphalt, importing road base, and preparing for a 150m concrete slab pour outside the building.
- 01Recycled Asphalt Use
- 02Road Base Importation
- 03Site preparation
- 04Concrete slab pouring
Recycled Asphalt Use
Utilized recycled asphalt to promote sustainability and cost-effectiveness in site preparation. Total amount 4400 sqm
Road Base Importation
Imported high-quality road base material to ensure a stable foundation for the slab. Total amount 5000 sqm
Site preparation
Conducted thorough site preparation, including grading and compaction, for optimal concrete slab placement.
Concrete slab pouring
Coordinated logistics for the preparation and pouring of a 150m concrete slab outside the building.
Challenges
Waste management
Challenges in managing and recycling materials efficiently on-site.
Foundation preparation
Additional work required to ensure proper foundation preparation for the concrete slab.
Communication gaps
Maintaining effective communication among all stakeholders proved challenging.
Inspection delays
Waiting for inspections from regulatory bodies impacted the timeline.









