Jurien Bay 225 Sewer System

2024
Year
Awarded
Contract type
4
Site photos
Jurien Bay, Western Australia
Region

The project involves the installation of a 5.5-meter deep sewer system in Jurien Bay, addressing challenges posed by a high water table and dewatering needs.

  • 01 Heritage assessment
  • 02 Deep sewer install
  • 03 Dewatering solutions
  • 04 Excavation works

Heritage assessment

Conducting assessments to identify and protect any heritage sites.

Deep sewer install

Excavating and installing a 5.5-meter deep sewer line connecting in to a live connection.

Dewatering solutions

Implementing systems to manage high water table conditions effectively.

Excavation works

Using appropriate machinery for deep excavation in challenging conditions.

Challenges

High water table

Encountered a high water table that complicated excavation and required additional dewatering measures.

Existing Infrastructure

Navigated existing underground utilities that posed risks to installation and required careful planning using shoring boxes in congested areas.