Champion Lakes Stormwater

2024
Year
Sub Contractor
Contract type
3
Site photos
Champion Lakes, Western Australia
Region

The project involved stormwater installation in Champion Lakes, addressing clay soil conditions and fluctuating water tables to ensure effective drainage solutions.

  • 01 Drainage Design
  • 02 Excavation Works
  • 03 Install Systems
  • 04 Project Documentation

Drainage Design

Development of an effective stormwater management plan tailored for the site.

Excavation Works

Excavating trenches and pits to install drainage systems.

Install Systems

Laying down pipes, inlets, and outlets for efficient water flow.

Project Documentation

Maintaining records of progress, materials used, and compliance with regulations.

Challenges

Clay Soil Compaction

Difficulty in achieving proper compaction due to saturated clay conditions.

Weather Impacts

Rainfall causing delays and requiring adaptive scheduling for wet conditions.